Overview:
Our team successfully completed and dispatched a fully powered, equipped workshop with AC for Final Stage of Tui Project Oil Field Decomissioning in NZ in February 2024.
From receiving RFQ, drafting design to sourcing all items & materials, we have completed assembling racks, installing power, AC, toolbox and more in our workshop.
We have also completed all related tests and certification as per the client’s procedure.
Specifications:
- 20ft container
- Caged shelves with a door (2000 x 600 x 1800)
- 2 x lights above the work bench
- 500kg slewing jib wall-mounted crane
- 2 x lights on the roof centre
- 3 x double GPA 32A
- Toolbox storage (615 x 330 x 740)
- Work bench (4000 x 800 x 950
- Two rows of load rate hooks
- DG Cabinet